How to Call A Scheduler In Oracle From Java?

7 minutes read

To call a scheduler in Oracle from Java, you can use the OracleScheduler class from the oracle.jdbc.driver package. First, you need to establish a connection to the database using the DriverManager class and the appropriate JDBC URL, username, and password. Then, you can create an instance of the OracleScheduler class and use its methods to interact with the scheduler. This includes creating, modifying, and deleting jobs, job classes, and schedules. Make sure to handle any exceptions that may occur, such as SQLExceptions or ClassNotFoundExceptions, when calling the scheduler from Java.

Best Oracle Books to Read of September 2024

1
Oracle PL/SQL by Example (The Oracle Press Database and Data Science)

Rating is 5 out of 5

Oracle PL/SQL by Example (The Oracle Press Database and Data Science)

2
Oracle Database 12c DBA Handbook (Oracle Press)

Rating is 4.9 out of 5

Oracle Database 12c DBA Handbook (Oracle Press)

3
Oracle Database Administration: The Essential Refe: A Quick Reference for the Oracle DBA

Rating is 4.8 out of 5

Oracle Database Administration: The Essential Refe: A Quick Reference for the Oracle DBA

4
Oracle DBA Mentor: Succeeding as an Oracle Database Administrator

Rating is 4.7 out of 5

Oracle DBA Mentor: Succeeding as an Oracle Database Administrator

5
OCA Oracle Database SQL Exam Guide (Exam 1Z0-071) (Oracle Press)

Rating is 4.6 out of 5

OCA Oracle Database SQL Exam Guide (Exam 1Z0-071) (Oracle Press)

6
Oracle Database 12c SQL

Rating is 4.5 out of 5

Oracle Database 12c SQL

7
Oracle Autonomous Database in Enterprise Architecture: Utilize Oracle Cloud Infrastructure Autonomous Databases for better consolidation, automation, and security

Rating is 4.4 out of 5

Oracle Autonomous Database in Enterprise Architecture: Utilize Oracle Cloud Infrastructure Autonomous Databases for better consolidation, automation, and security


What are the limitations of using Oracle Scheduler in Java programming?

  1. Oracle Scheduler may not be suitable for complex scheduling requirements that involve intricate logic and dependencies among tasks.
  2. Oracle Scheduler may not be as flexible or customizable as other third-party scheduling libraries or tools available in the market.
  3. Oracle Scheduler may have limited support for certain advanced scheduling features, such as event-driven scheduling or dynamic job creation.
  4. Oracle Scheduler may not integrate seamlessly with other programming languages or platforms, as it is primarily designed for use with Oracle databases and PL/SQL.
  5. Oracle Scheduler may have performance limitations when dealing with large numbers of scheduled jobs or frequent job executions.
  6. Oracle Scheduler may lack certain monitoring and management capabilities that are essential for efficient scheduling and job execution in a production environment.


How to interact with Oracle Scheduler using Java?

To interact with Oracle Scheduler using Java, you can use the Oracle Scheduler APIs provided by Oracle. Here is a basic example of how you can create and schedule a job using Java:

  1. First, you need to import the necessary Oracle Scheduler classes:
 1
 2
 3
 4
 5
 6
 7
 8
 9
10
11
import oracle.jdbc.OracleConnection;
import oracle.jdbc.OraclePreparedStatement;
import oracle.jdbc.OracleResultSet;
import oracle.jdbc.OracleStatement;
import oracle.jdbc.pool.OracleDataSource;
import oracle.jdbc.replay.OracleReplayCallback;
import oracle.sql.BINARY_DOUBLE;
import oracle.sql.BLOB;
import oracle.sql.CLOB;
import oracle.sql.Datum;
import oracle.sql.NUMBER;


  1. Next, you need to set up a connection to your Oracle database:
1
2
3
4
5
6
OracleDataSource ods = new OracleDataSource();
ods.setURL("jdbc:oracle:thin:@localhost:1521:orcl");
ods.setUser("username");
ods.setPassword("password");

OracleConnection conn = (OracleConnection) ods.getConnection();


  1. Now you can create and schedule a job:
1
2
OraclePreparedStatement stmt = (OraclePreparedStatement) conn.prepareStatement("BEGIN DBMS_SCHEDULER.CREATE_JOB(job_name => 'my_job', job_type => 'PLSQL_BLOCK', job_action => 'BEGIN my_procedure(); END;', start_date => SYSTIMESTAMP, repeat_interval => 'FREQ=DAILY; INTERVAL=1'); END;");
stmt.execute();


This code snippet creates a job called 'my_job' that calls a PL/SQL procedure called 'my_procedure()' daily.

  1. You can also view the scheduled jobs:
1
2
3
4
5
6
7
OracleStatement stmt = (OracleStatement) conn.createStatement();
OracleResultSet rs = (OracleResultSet) stmt.executeQuery("SELECT job_name FROM user_scheduler_jobs");

while (rs.next()) {
    String jobName = rs.getString("job_name");
    System.out.println("Scheduled job: " + jobName);
}


This code snippet retrieves all the scheduled jobs for the current user and prints out their names.


These are just some basic examples to get you started with interacting with Oracle Scheduler using Java. Make sure to handle exceptions and close the connections properly in your actual code.


How to pause and resume a scheduler job in Oracle with Java code?

To pause and resume a scheduler job in Oracle using Java, you can use the following code:

 1
 2
 3
 4
 5
 6
 7
 8
 9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
import java.sql.Connection;
import oracle.jdbc.OracleCallableStatement;

public class SchedulerJobManager {

    private Connection conn;

    public SchedulerJobManager(Connection conn) {
        this.conn = conn;
    }

    public void pauseJob(String jobName) throws Exception {
        String sql = "BEGIN DBMS_SCHEDULER.SUSPEND_JOB(job_name => ?); END;";
        OracleCallableStatement stmt = (OracleCallableStatement) conn.prepareCall(sql);
        stmt.setString(1, jobName);
        stmt.execute();
        stmt.close();
    }

    public void resumeJob(String jobName) throws Exception {
        String sql = "BEGIN DBMS_SCHEDULER.RESUME_JOB(job_name => ?); END;";
        OracleCallableStatement stmt = (OracleCallableStatement) conn.prepareCall(sql);
        stmt.setString(1, jobName);
        stmt.execute();
        stmt.close();
    }
}


You can then use this SchedulerJobManager class to pause and resume scheduler jobs in Oracle. Make sure to pass the Connection object to the SchedulerJobManager constructor before calling the pauseJob or resumeJob methods with the job name as a parameter.

Facebook Twitter LinkedIn Telegram

Related Posts:

To pass a list from Java to an Oracle procedure, you can use an array or a collection type in Java to represent the list data. You can then pass this array or collection as a parameter to the Oracle procedure using JDBC. The Oracle procedure should be designed...
To use the MySQL event scheduler in a CodeIgniter model, first you need to create a scheduled event in your database. You can do this using SQL commands in your database management tool.Next, you should connect to your database in your CodeIgniter model using ...
In Oracle, the equivalent of SQL Profiler is a tool called Oracle Trace or Oracle Trace File Analyzer (TFA). This tool allows users to capture and analyze SQL statements and other activities happening in an Oracle database. It provides detailed information abo...